ZLW3CX
Overall dimensions : 6096*2335*3555mm
Overall weight : 7500kg
Capacity of bucket : 0.3m³
Bucket capacity : 1m³
rated power : 85KW





|
Overall dimensions |
|
|
Overall dimensions(mm) |
6096*2335*3555 |
|
wheelbase(mm) |
2200 |
|
Track width(mm) |
1850/2000 |
|
Ground clearance(mm) |
300 |
|
minimum turning radius(mm) |
6580 |
|
Performance parameter |
|
|
system pressure(Mpa) |
28 |
|
Overall weight(kg) |
7500 |
|
maximum speed(Km/h) |
22-35 |
|
gradeability(°) |
35 |
|
Mining parameters |
|
|
Maximum Telescopic Excavation Depth (mm) |
4000 |
|
Excavation unloading height(mm) |
4500 |
|
Maximum digging radius(mm) |
5800 |
|
Maximum lifting height(mm) |
6060 |
|
Capacity of bucket(m³) |
0.3 |
|
Excavator rotation angle(°) |
190 |
|
Loading parameters |
|
|
Maximum Dumping Height(mm) |
2742 |
|
Maximum unloading distance(mm) |
1062 |
|
Bucket capacity(m³) |
1 |
|
Rated loading capacity(KG) |
2500 |
|
Engine |
|
|
model |
Yudong4105supercharge |
|
type |
Turbo |
|
rated power(KW) |
85 |
|
rated speed(r/min) |
2400 |
|
Number of cylinders - inner diameter |
4-105 |
|
Transmission system |
|
|
Transmission |
Fixed axle power shift |
|
number of gears |
Front 2 Rear 2 |
|
Hydraulic torque converter |
YJ280 |
|
Axle |
|
|
type |
First stage wheel reduction bridge |
|
tyre |
|
|
model |
14-17.5/19.5L-24 |
|
Brake |
Air top oil caliper disc brake |
|
parking braking |
Air brake |
|
Oil quantity |
|
|
fuel tank(L) |
100 |
|
hydraulic tank(L) |
100 |
|
Other |
|
|
Driving Type |
Four-wheel drive |
|
Variable speed type |
Hydraulic transmission |
|
control system |
Electromagnetic hydraulic pilot control |